Kuivamatala, Finland wind farm facts and numbers

April 15, 2018 by James

Kuivamatala wind farm is located in Oulu, Finland. It was created in 1998 and is owned by .

It is near Kuivaniemi.

See below for data.

Wind farms, as a general rule need wind speeds of 4.5 metres per second or more.

A great destination for a project like Kuivamatala would have a near constant flow of non-turbulent wind all year long, with a minimum chances of abrupt potent bursts of wind. Additionally, you wouldn’t get a turbine like associated if Kuivamatala was not built near local demand or transmission capaKuivaniemi.

Before building, Kuivamatala was almost certainly screened on the basis of a wind atlas, and validated with wind measurements. Meteorological wind data alone is usually not ample for accurate siting of a large wind power project.

Site information around Kuivaniemi would have been a major factor in the development conclusion Winds around Kuivaniemi are examined for at least a year or so alongside the creation of detailed maps. Only then are wind turbines installed.

The wind blows sooner at greater altitudes due to the reduced influence of drag. The increase in velocity with altitude is most extraordinary at the surface and is impacted by topography, surface roughness, and upwind hurdles such as trees or buildings. Velocity grows with altitude and is more evident near land and is altered by terrain, surface and limitations.

Wind speeds escalating with altitude is part of a wind energy law. This forecasts wind speed rises with the 7th root of altitude. Increasing the height of a turbine, then, raises the anticipated wind speeds by 10%, and the anticipated power by 34%.

The distance of 7x Rotor Diameter is placed between each turbine, ie they are spaced out to make sure they don’t affect each other. But this may not be the situation in hilly areas.

Kuivamatala turbines are related via medium voltage lines and communications.

At a substation, that medium-voltage electric energy is increased in voltage with a transformer for connection to the high voltage transmission system. Development of a land-based wind farm requires installation of the collector system and substation, and possibly access roads to each and every turbine site.

Facts about Kuivamatala wind farm

  • Name: Kuivamatala
  • Wind turbine Supplier: Nordex, Model: 1.5MW, Units: 10,
  • Country: Finland
  • Developer: Vapon Tuulivoima Oy
  • State: Oulu
  • City: Kuivaniemi
  • Owner:

Filed Under: Finland

Olhavan laajennus (Olhavan expansion), Finland wind farm facts and numbers

April 15, 2018 by James

Olhavan laajennus (Olhavan expansion) wind project was installed in Oulu, Finland It was finished in 2014 and is owned by .

It is near Olhava.

See below for data.

As a general rule, economic wind machines require a wind speed of 4.5 m/s (16 km/h) or bigger.

A perfect location for a project like Olhavan laajennus (Olhavan expansion) might have a near constant flow of non-turbulent wind throughout the year, with a minimum likelihood of sudden potent bursts of wind. Additionally, you would not get a turbine like included if Olhavan laajennus (Olhavan expansion) was not built near local demand or transmission capaOlhava.

During the planning stages the Olhavan laajennus (Olhavan expansion) wind farm would’ve been checked and endorsed through wind measurements. Meteorological wind data alone is usually not sufficient for precise siting of a large wind power project.

Site data around Olhava is a major element in the ‘development’ conclusion Local winds are frequently examined for a year or more, and detailed wind maps created before wind generators are installed.

Altitude would also possess a part to performwithin a project like Olhavan laajennus (Olhavan expansion). This is due to drag The surge in velocity with altitude is most extraordinary at the surface and is impacted by topography, surface roughness, and upwind obstructions such as trees or buildings. Velocity grows with altitude and it is more pronounced near land and is altered by terrain, surface and hurdles.

Wind speeds raising with altitude is part of a wind energy law. This Oulus wind speed rises with the 7th root of altitude. Doubling the altitude of a turbine, then, boosts the anticipated wind speeds by 10%, and the expected power by 34%.

The distance of 7x Rotor Diameter is placed between each turbine, ie they’re spaced out so they really don’t affect one another. But micrositing maximizes placement, particularly in hilly areas.

Olhavan laajennus (Olhavan expansion) turbines are linked via medium voltage lines and communications.

At a substation, this medium-voltage electric energy is elevated in voltage with a transformer for link with the high voltage transmission system. Development of a land-based wind farm requires installation of the collector system and substation, and probably access roads to each and every turbine site.

Facts about Olhavan laajennus (Olhavan expansion) wind farm

  • Name: Olhavan laajennus (Olhavan expansion)
  • Wind turbine Supplier: General Electric, Model: GE1.5s, Units: 34,
  • Country: Finland
  • Developer: Tuuliwatti
  • State: Oulu
  • City: Olhava
  • Owner:

Filed Under: Finland

Kokkola, Finland wind farm facts and numbers

April 14, 2018 by James

Kokkola wind project was set up in Western Finland, Finland It was completed in 2003 and is owned by .

It is near Kokkola.

See below for data.

Wind farms, as a general rule call for wind speeds of 4.5 metres per second or more.

A perfect location for a project like Kokkola could have a near constant flow of non-turbulent wind all year round, having a minimum chances of sudden potent bursts of wind. An important factor of turbine siting is furthermore admittance to local requirement or transmission capaKokkola.

During the planning stages the Kokkola wind farm would’ve been checked and confirmed through wind measurements. However, Kokkola wind farm would have needed more than just meteorological data and measurements.

Site data around Kokkola is a major factor in the ‘development’ decision Local winds are often checked for a year or more, and detailed wind maps built before wind generators are set up.

The wind hits speedier at greater altitudes because of the reduced effect of drag. The boost in velocity with altitude is most remarkable near the surface and is affected by topography, surface roughness, and upwind obstacles such as trees or buildings. Velocity rises with altitude and it is more evident near land and is changed by geography, surface and obstacles.

Wind speeds growing with altitude is part of a wind energy law. This predicts wind speed rises with the 7th root of altitude. Doubling the height of a turbine, then, raises the predicted wind speeds by 10%, and the anticipated power by 34%.

In general, a distance of 7D (7 × Rotor Diameter of the Wind Turbine) is about between each turbine in a fully developed wind farm. However this is not always the situation in hilly areas.

Individual turbines at Kokkola are interlocked with a medium voltage (usually 34.5 kV) power collection system and communications network.

At a substation, this medium-voltage electric current is improved in voltage using a transformer for connection to the high voltage transmission system. Construction of a land-based wind farm requires setting up the collector system and substation, and probably roads to each and every turbine site.

Facts about Kokkola wind farm

  • Name: Kokkola
  • Wind turbine
  • Country: Finland
  • Developer: Innopower Oy
  • State: Western Finland
  • City: Kokkola
  • Owner:

Filed Under: Finland

Mussalo harbour, Finland wind farm facts and numbers

April 14, 2018 by James

Mussalo harbour wind project was installed in Southern Finland, Finland It was completed in 2014 and is owned by Kotkan Energie.

It is near Mussalo harbour in Kotka.

See below for data.

Typically, economic wind machines require a wind speed of 4.5 m/s (16 km/h) or more.

The best location for something such as Mussalo harbour would be a steady supply of non-turbulent wind. Additionally, you would not get a turbine Kotkan Energie like Kotkan Energie associated if Mussalo harbour was not built near local demand or transmission capaMussalo harbour in Kotka.

During the planning stages the Mussalo harbour wind farm would have been checked and confirmed through wind measurements. However, Mussalo harbour wind farm would have needed more than just meteorological data and measurements.

Assortment of site-specific data for wind speed and direction could have been important to determining site potential in order to finance the project. Winds around Mussalo harbour in Kotka are evaluated for at least a year or so alongside the introduction of detailed maps. Only then are wind turbines installed.

Altitude would also have a part to performin a project like Mussalo harbour. This is due to drag The boost in velocity with altitude is most spectacular near the surface and is affected by topography, surface roughness, and upwind obstacles such as trees or buildings. Velocity rises with altitude and it is more distinct near land and is changed by landscape, surface and hurdles.

Typically, the rise of wind speeds with increasing elevation follows a wind profile power law, which predicts that wind speed rises proportionately to the seventh root of altitude. Doubling the elevation of a turbine, then, enhances the predicted wind speeds by 10%, and the anticipated power by 34%.

In general, a range of 7D (7 × Rotor Diameter of the Wind Turbine) is about between each turbine in a fully developed wind farm. But this isn’t necessarily the case in hilly areas.

Mussalo harbour turbines are related via medium voltage lines and communications.

At a substation, that medium-voltage electric energy is elevated in voltage with a transformer for link with the high voltage transmission system. Development of a land-based wind farm requires installation of the collector system and substation, and probably access roads to each and every turbine site.

Facts about Mussalo harbour wind farm

  • Name: Mussalo harbour
  • Wind turbine Supplier: Enercon, Model: E-92 2.3MW, Units: 2,
  • Country: Finland
  • Developer:
  • State: Southern Finland
  • City: Mussalo harbour in Kotka
  • Owner: Kotkan Energie

Filed Under: Finland

  • Page 1
  • Page 2
  • Page 3
  • …
  • Page 11
  • Next Page »

Primary Sidebar

Recent Posts

  • Wind Turbine Rotor Blade Market Outlook Study of Key Players Profiles on Technological Advancements, Mounting Demand and Geography Forecast period 2017-2026 – The Columnist
  • Gunfleet Sands 1 and 2 wind farm facts and numbers
  • New U.S. Wind Turbine Database – Solar Thermal Magazine
  • 4 States Get Over 30 Percent of Power from Wind — and All Lean Republican | InsideClimate News
  • Catching a breeze: America’s belated push to develop offshore wind energy – Rational Review News Digest

Categories

  • Algeria
  • Argentina
  • Aruba
  • Australia
  • Austria
  • Azerbaijan
  • Bangladesh
  • Belarus
  • Belgium
  • Blog
  • Bolivia
  • Bosnia-Herzegovina
  • Brazil
  • Bulgaria
  • Canada
  • Cape Verde
  • Chile
  • China
  • Colombia
  • Costa Rica
  • Croatia
  • Cuba
  • Curaçao
  • Cyprus
  • Czech Republic
  • Denmark
  • Dominican Republic
  • Ecuador
  • Egypt
  • Estonia
  • Ethiopia
  • Finland
  • France
  • Germany
  • Greece
  • Guatemala
  • Honduras
  • Hungary
  • Iceland
  • India
  • information
  • Iran
  • Ireland
  • Israel
  • Italy
  • Jamaica
  • Japan
  • Jordan
  • Kenya
  • Latvia
  • Lithuania
  • Luxembourg
  • Macedonia
  • Mauritania
  • Mauritius
  • Mexico
  • Mongolia
  • Morocco
  • Mozambique
  • New Zealand
  • Nicaragua
  • Norway
  • Pakistan
  • Peru
  • Philippines
  • Poland
  • Portugal
  • Romania
  • Russian Federation
  • Samoa
  • Seychelles
  • South Africa
  • South Korea
  • Spain
  • Sri Lanka
  • Sweden
  • Switzerland
  • Taiwan
  • Thailand
  • The Netherlands
  • Tunisia
  • Turkey
  • UK
  • Ukraine
  • Uncategorized
  • Uruguay
  • USA
  • Venezuela
  • Vietnam

Footer

Terms

Terms and Privacy Policy are coming soon.

Copyright © 2018 · Genesis Sample on Genesis Framework · WordPress · Log in